Spring 2021

The start of the spring semester has us shifting gears to developing the code necessary to automate the station. Along with that we will also be designing tests to perform on the station.

Construction is complete and the workspace has been cleaned and converted into a coding lab for the three engineers.
When measuring RF and uW signals it important to follow proper cable care.
Joshua conduction a mechanical calibration on the Fieldfox. The calibration is necessary to remove any loss in the cable by moving the cal plane to the end of the cables.

Jesus realigning the RX antenna.